Bank of America Tower at One Bryant Park

Project Profiles

Bank of America Tower at One Bryant Park

Learn more about our environmental strategy work and services by emailing us at [email protected]. Follow the conversation on twitter: @TerrapinBG.

©dBox/COOKFOX Architects

Section of tower showing underfloor air distribution and views to Bryant Park. Copyright dBox/COOKFOX Architects

When completed in 2010, the Bank of America Tower became arguably the country’s most environmentally advanced high-rise office building, and the first to achieve the U.S. Green Building Council’s Leadership in Energy & Environmental Design (LEED) Platinum designation. At 2.2 million square feet, the project incorporates innovative, high-performance technologies to use dramatically less energy, consume less potable water, and provide a healthy and productive environment for employees.

With the goal of creating the best possible modern workplace and a showcase of sustainable design, the project emphasizes daylight and views, indoor air quality, and efficient use of water, energy, and materials. Advanced technologies include a state-of-the-art, onsite 4.6 megawatt co-generation plant; under-floor displacement air ventilation; and a thermal storage system that produces ice at night, reducing the building’s peak energy demands. The use of 95% particulate filtration and carbon dioxide sensors will ensure that indoor air is as clean and healthy as possible – cleaner, in fact, than the outdoor air in midtown Manhattan. Informed by concepts of biophilia, the building provides a light-filled workplace and impressive views of the city; meanwhile, the building’s highly transparent, high-performance curtain wall utilizes a low-e coating, custom frit shading pattern, and interior daylight dimming system to minimize energy demands.

©David Sundberg/ESTO

The high-performance curtain wall systems utilizes a low-e coating and a custom frit shading pattern. ©David Sundberg/ESTO

The project strives to raise the profile of green building while helping lead a transformation in the local real estate and construction markets. Locally manufactured, recycled, and renewable materials have been used wherever possible; for example, all concrete used in the project was made with 45% blast furnace slag, an industrial waste product, preventing over 56,000 tons of CO2 from entering the atmosphere. A pioneer of large-scale green buildings, the tower also exemplifies the inherent advantages of urban living: its location, at the corner of Sixth Avenue and 42nd Street, is among the country’s best-located sites for accessing public transportation.

©David Sundberg/ESTO

NYC skyline with One Bryant Park, 4 Times Square and the Empire State Building. ©David Sundberg/ESTO

Working in collaboration the building ownership and a team of talented consultants, contractors and engineers, Terrapin Partners Bob Fox and Rick Cook combined their experience to design the Bank of America Tower. Bill Browning, working with a team from Rocky Mountain Institute, led a design charrette during the project’s early phases, helping to ensure a highly integrated, whole-systems approach.

 

*Work performed by Bill Browning in affiliation with both the Rocky Mountain Institute and Terrapin.

*Header and feature image copyright COOKFOX Architects

Catie is the Director of Projects at Terrapin and a leader in biophilic design movement. With a background in urban green infrastructure, Catie's interest lies in systems thinking to address human health and sustainability challenges at each scale of the built environment.